APH/ EPH % FOR COMPLETED JOBS

The APH (Actual Production Hours) divided by the EPH (Estimated Production Hours) worked on a job. This is displayed as a percentage – we want the actual hours worked to be 100% or less than the estimated hours to be worked. This is an upside down graph because the lower the percentage, the better.